In Port of Rotterdam 30,000 vessels are docking faster than ever

Learn how three developers reduced the carbon footprint one of the largest ports in the world

Spoiler: it involves software.

THE MAGIC OF AN ORDINA HIGH PERFORMANCE TEAM

| minute read

To solve huge challenges, you need bold ideas and forward thinkers

CO2 emissions in shipping must be reduced to contribute to sustainability and climate goals. With more than 30.000 ships a year, Port of Rotterdam can take an essential step in this direction. To realize this ambition, a team of developers from Sopra Steria joined forces with the client to develop a unique and sustainable solution.

Road to a smart, carbon-neutral port

Port of Rotterdam is continuously exploring new ideas to make the port smarter, more efficient, safer and more sustainable. A smart, carbon-neutral port requires radical innovation and new technologies.

The Challenge: Can we reduce the waiting time for 30.000 vessels?


Timing is everything for port calls. Each docking demands numerous actions to be performed at the right moment. Port of Rotterdam receives about 30,000 ships annually. About 30% of global shipping is delayed in port or between ports. This leads to wasted time, money and fuel. Providing real-time information on planned, expected and completed times helps avoid bottlenecks and enables optimization of port calls. As a result, delays can be avoided and port calls become more predictable, efficient and sustainable. 

THE GOAL: Lower CO2 emission reduction with every call

By exchanging real-time information, all operations can be planned with unprecedented efficiency. It eliminates unnecessary early arrivals, reduces anchor time, and allows ships to reduce their carbon footprint.

ADDITIONAL GOALS

• Lower CO2 for each port call
• Streamline port operations
• Increase predicability in planning
• Decrease expenses

TEAM SYNERGY: All hands-on desktop

For Port of Rotterdam's ambition to be realized, the client needed a team of headstrong developers. A team that can work autonomously and real close with the customer team. Sopra Steria’s High-Performance Team and Port of Rotterdam worked closely together, trusted each other and were all eager to put some elbow grease into it. Which leaded to excellent results.

Expertise X Autonomy = Excellence

Working synergistically together strives to maximize output and take responsibility. The High-Performance Teams create a shared mindset and focus on continuous improvement. This enables autonomous work and builds the foundation of trust and experience.

 

LINK TO RECRUITMENT SITE

IMPACT: 20% Saving time in waiting for each port call

The first quantitative benefits of using PortXchange have already been demonstrated: a completed pilot with shipping companies, terminals, and agencies generated a 20% saving in waiting time. Research by TNO has shown that 4% of emissions (134,000 tons of CO2 per year) can easily be reduced in this way.

SOLUTION: Reduce CO2 emissions and digitalize port calls

The PortXchange Synchronizer ensures that the exchange of planned, expected, and realized times allows a port call to be scheduled smarter, faster, and more efficiently.

 

LEARN MORE